What to Expect During Installation

  • Professional installation crew
  • Complete installation typically completed in 1 day
  • Delivery, set, and start
  • Leveling generator
  • Installation and positioning of generator based on discussed option during on-site consultation
  • Install transfer switch

side-yard

  • Install any required A/C load-shed or soft-start devices
  • Simulate an outage to test generator function
  • Step-by-Step walk-through of generator operation with homeowner after installation
  • Obtain any locally required permits for gas and electrical work
  • Schedule inspections
  • Clean-up after installation